Brand:

CCI CB 22LR LONG LEAD ROUND NOSE – 29GR, 710FPS

18.99$

Model: 38.
Caliber: 22 Long.
Type: Conical Ball (CB).
Weight: 29 grains.
Velocity: 710 ft/s.
Rounds per box: 100.

42 in stock

076683000385
UPC: 076683000385 SKU: 38 Category: Tags: , , , , , , Brand:

Description

Model: 38.
Caliber: 22 Long.
Type: Conical Ball (CB).
Weight: 29 grains.
Velocity: 710 ft/s.
Rounds per box: 100.

Additional information

Caliber

Brand

UPC

EAN

MPN