Description
Model: 38.
Caliber: 22 Long.
Type: Conical Ball (CB).
Weight: 29 grains.
Velocity: 710 ft/s.
Rounds per box: 100.
18.99$
Model: 38.
Caliber: 22 Long.
Type: Conical Ball (CB).
Weight: 29 grains.
Velocity: 710 ft/s.
Rounds per box: 100.
26 in stock
Model: 38.
Caliber: 22 Long.
Type: Conical Ball (CB).
Weight: 29 grains.
Velocity: 710 ft/s.
Rounds per box: 100.
| Caliber |
|---|
You must be logged in to post a review.
Reviews
There are no reviews yet.