Brand:

Cci Cb 22lr Long Lead Round Nose – 29gr, 710fps

18.99$

Model: 38.
Caliber: 22 Long.
Type: Conical Ball (CB).
Weight: 29 grains.
Velocity: 710 ft/s.
Rounds per box: 100.

30 in stock

SKU: 38 Categories: , , Tags: , , , , , , Brand:

Description

Model: 38.
Caliber: 22 Long.
Type: Conical Ball (CB).
Weight: 29 grains.
Velocity: 710 ft/s.
Rounds per box: 100.

Additional information

Caliber

Reviews

There are no reviews yet.

Be the first to review “Cci Cb 22lr Long Lead Round Nose – 29gr, 710fps”